TAP203468

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

TAP203468 is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerNORTHERN WASCO COUNTY PUD
Coordinates46.6450, -118.9235

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68126115 kVBONNEVILLE POWER ADMINISTRATION4.7 mi
#68127115 kVBONNEVILLE POWER ADMINISTRATION2.6 mi
#77403115 kVNORTHERN WASCO COUNTY PUD7.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203468, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203468 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LOWER MONUMENTALSubstation-AdjacentWAFranklin County500 kV1,000 MW1.7 yrs70.4
TAP206327Substation-AdjacentWAFranklin County115 kV100 MW1.7 yrs68.5
BENTONSubstation-AdjacentWAFranklin County230 kV300 MW1.7 yrs68.1
TAP203473Substation-AdjacentWABenton County115 kV100 MW1.7 yrs68.0
BROADMOORSubstation-AdjacentWABenton County115 kV100 MW1.7 yrs67.9
STEVENS DRIVESubstation-AdjacentWABenton County115 kV100 MW1.7 yrs67.7
THAYER DRIVESubstation-AdjacentWABenton County115 kV100 MW1.7 yrs67.5
RICHLANDSubstation-AdjacentWABenton County115 kV100 MW1.7 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203468 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.