TAP203458

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

TAP203458 is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerOKANOGAN COUNTY ELEC COOP, INC
Coordinates48.3597, -120.0915

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68092115 kVBONNEVILLE POWER ADMINISTRATION11.4 mi
#74342115 kVOKANOGAN COUNTY ELEC COOP, INC9.9 mi
#74343115 kVOKANOGAN COUNTY ELEC COOP, INC0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203458, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203458 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PATEROSSubstation-AdjacentWADouglas County115 kV100 MW1.7 yrs62.5
TAP209273Substation-AdjacentWADouglas County115 kV100 MW1.7 yrs61.1
UNKNOWN209274Substation-AdjacentWAOkanogan County115 kV100 MW1.7 yrs60.7
BREWSTERSubstation-AdjacentWADouglas County115 kV100 MW1.7 yrs58.9
TWISPSubstation-AdjacentWAOkanogan County115 kV100 MW1.7 yrs58.0
UNKNOWN206245Substation-AdjacentWAOkanogan County115 kV100 MW1.7 yrs57.4
Greenfield (WELLS - FOSTER CREEK)GreenfieldWADouglas County230 kV300 MW1.7 yrs57.2
OZ OkanoganGreenfieldWAOkanogan1.7 yrs56.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203458 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.