TAFT is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as extra-high-voltage (500 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines1

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Coordinates47.4564, -115.5892

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67234500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE96.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAFT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAFT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAFTSubstation-AdjacentIDShoshone County500 kV1,000 MW1.1 yrs75.2
Greenfield (TAFT - HOT SPRINGS)GreenfieldMTSanders County500 kV1,000 MW1.1 yrs70.5
Greenfield (TAFT - HOT SPRINGS)GreenfieldMTSanders County500 kV1,000 MW1.1 yrs70.4
Greenfield (DWORSHAK - TAFT)GreenfieldIDShoshone County500 kV1,000 MW1.1 yrs70.2
Greenfield (NOXON - HOT SPRINGS)GreenfieldMTSanders County230 kV300 MW1.1 yrs68.2
Greenfield (NOXON - HOT SPRINGS)GreenfieldMTSanders County230 kV300 MW1.1 yrs67.3
Greenfield (NOXON - HOT SPRINGS)GreenfieldMTSanders County230 kV300 MW1.1 yrs67.2
Greenfield (TAFT - HOT SPRINGS)GreenfieldIDShoshone County500 kV1,000 MW1.1 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAFT substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.