SPIRIT

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

SPIRIT is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Coordinates48.8144, -117.6459

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68231115 kVBONNEVILLE POWER ADMINISTRATION5.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SPIRIT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SPIRIT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BOUNDARYSubstation-AdjacentWAPend Oreille County230 kV300 MW1.7 yrs63.9
NELWAYSubstation-AdjacentWAPend Oreille County230 kV300 MW1.7 yrs63.3
TAP203494Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs61.1
TAP203493Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs60.7
Greenfield (CUSICK - BOUNDARY)GreenfieldWAPend Oreille County230 kV300 MW1.7 yrs60.0
BOX CANYONSubstation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs59.6
Greenfield (CUSICK - BOUNDARY)GreenfieldWAPend Oreille County230 kV300 MW1.7 yrs59.6
TAP203495Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs59.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.