SILVERADO

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

SILVERADO is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPUD NO 1 OF CLALLAM COUNTY
Coordinates48.1312, -123.7678

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68017115 kVBONNEVILLE POWER ADMINISTRATION0.0 mi
#75194115 kVPUD NO 1 OF CLALLAM COUNTY1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SILVERADO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SILVERADO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PORT ANGELESSubstation-AdjacentWAClallam County230 kV300 MW1.7 yrs63.2
TAP207151Substation-AdjacentWAClallam County115 kV100 MW1.7 yrs60.1
TAP207140Substation-AdjacentWAJefferson County115 kV100 MW1.7 yrs60.0
TAP207144Substation-AdjacentWAClallam County115 kV100 MW1.7 yrs59.2
TAP203447Substation-AdjacentWAClallam County115 kV100 MW1.7 yrs55.2
SILVERADOSubstation-AdjacentWAClallam County115 kV100 MW1.7 yrs54.7
UNKNOWN207153Substation-AdjacentWAClallam County115 kV100 MW1.7 yrs54.7
OZ ClallamGreenfieldWAClallam1.7 yrs51.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SILVERADO substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.