SICKLER

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
500
kV

SICKLER is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Coordinates47.5367, -120.2802

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67213500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE38.4 mi
#67216500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE45.0 mi
#68082230 kVBONNEVILLE POWER ADMINISTRATION0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SICKLER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SICKLER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLUMBIASubstation-AdjacentWAKittitas County500 kV1,000 MW1.7 yrs74.9
UNKNOWN201377Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs73.0
Greenfield (GRAND COULEE 500KV - COLUMBIA)GreenfieldWAGrant County500 kV1,000 MW1.7 yrs71.3
TAP206034Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs70.8
UNKNOWN209152Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.8
SICKLERSubstation-AdjacentWAChelan County500 kV1,000 MW1.7 yrs70.7
SCHULTZSubstation-AdjacentWAKittitas County500 kV1,000 MW1.7 yrs70.3
UNKNOWN201272Substation-AdjacentWAKittitas County230 kV300 MW1.7 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.