SEATTLE CITY EAST PINE

Substation

Washington · CITY OF SEATTLE - (WA)

Max voltage
230
kV

SEATTLE CITY EAST PINE is an electric transmission substation in Washington, operated by CITY OF SEATTLE - (WA). It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorCITY OF SEATTLE - (WA)
Coordinates47.6146, -122.3031

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72444230 kVCITY OF SEATTLE - (WA)3.4 mi
#74109115 kVCITY OF SEATTLE - (WA)2.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SEATTLE CITY EAST PINE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SEATTLE CITY EAST PINE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SNO-KINGSubstation-AdjacentWAKitsap County500 kV1,000 MW1.7 yrs77.1
MAPLE VALLEYSubstation-AdjacentWAKing County500 kV1,000 MW1.7 yrs76.0
TACOMASubstation-AdjacentWAPierce County500 kV1,000 MW1.7 yrs75.6
SNOHOMISHSubstation-AdjacentWASnohomish County345 kV600 MW1.7 yrs75.2
TAP200917Substation-AdjacentWASnohomish County500 kV1,000 MW1.7 yrs74.7
BOTHELLSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs73.9
MASSACHUSETTS STREETSubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs73.4
SEATTLE CITY EAST PINESubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs73.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SEATTLE CITY EAST PINE substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.