SAINT ANDREWS

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
230
kV

SAINT ANDREWS is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Coordinates47.6577, -119.3568

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68078230 kVBONNEVILLE POWER ADMINISTRATION43.0 mi
#68079230 kVBONNEVILLE POWER ADMINISTRATION29.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SAINT ANDREWS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SAINT ANDREWS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GRAND COULEE 500KVSubstation-AdjacentWADouglas County500 kV1,000 MW1.7 yrs69.6
GRAND COULEE 230KVSubstation-AdjacentWADouglas County500 kV1,000 MW1.7 yrs69.4
GRAND COULEESubstation-AdjacentWADouglas County500 kV1,000 MW1.7 yrs68.8
Greenfield (GRAND COULEE 500KV - HANFORD)GreenfieldWAGrant County500 kV1,000 MW1.7 yrs68.6
EPHRATASubstation-AdjacentWAGrant County115 kV100 MW1.7 yrs68.5
CENTRAL EPHRATASubstation-AdjacentWAGrant County115 kV100 MW1.7 yrs68.2
TAP209159Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs68.1
CHIEF JOSEPHSubstation-AdjacentWADouglas County500 kV1,000 MW1.7 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SAINT ANDREWS substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.