RICHMOND PARK

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

RICHMOND PARK is an electric transmission substation in Washington, operated by PUGET SOUND ENERGY INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPUGET SOUND ENERGY INC
Coordinates47.7779, -122.3477

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77224115 kVPUGET SOUND ENERGY INCIN SERVICE1.2 mi
#79094115 kVPUGET SOUND ENERGY INCIN SERVICE0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RICHMOND PARK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RICHMOND PARK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SNO-KINGSubstation-AdjacentWAKitsap County500 kV1,000 MW1.7 yrs77.1
MAPLE VALLEYSubstation-AdjacentWAKing County500 kV1,000 MW1.7 yrs76.0
SNOHOMISHSubstation-AdjacentWASnohomish County345 kV600 MW1.7 yrs75.2
BOTHELLSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs73.9
MASSACHUSETTS STREETSubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs73.4
SEATTLE CITY EAST PINESubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs73.3
BERRYDALESubstation-AdjacentWAKing County230 kV300 MW1.7 yrs73.1
TAP206030Substation-AdjacentWASnohomish County230 kV300 MW1.7 yrs72.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.