RALSTON

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

RALSTON is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Coordinates46.9130, -118.3146

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68196115 kVBONNEVILLE POWER ADMINISTRATION5.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RALSTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RALSTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LITTLE GOOSESubstation-AdjacentWAColumbia County500 kV1,000 MW1.7 yrs70.9
LOWER MONUMENTALSubstation-AdjacentWAFranklin County500 kV1,000 MW1.7 yrs70.4
Greenfield (LITTLE GOOSE - LOWER MONUMENTA)GreenfieldWAColumbia County500 kV1,000 MW1.7 yrs67.2
Greenfield (CENTRAL FERRY - LOWER MONUMENT)GreenfieldWAColumbia County500 kV1,000 MW1.7 yrs66.9
Greenfield (CENTRAL FERRY - LOWER MONUMENT)GreenfieldWAWalla Walla County500 kV1,000 MW1.7 yrs66.5
Greenfield (LITTLE GOOSE - LOWER MONUMENTA)GreenfieldWAWalla Walla County500 kV1,000 MW1.7 yrs66.5
Greenfield (LOWER MONUMENTAL - HANFORD)GreenfieldWAFranklin County500 kV1,000 MW1.7 yrs66.1
Greenfield (LOWER MONUMENTAL - LITTLE GOOS)GreenfieldWAWalla Walla County500 kV1,000 MW1.7 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RALSTON substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.