PHALEN GULCH

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
500
kV

PHALEN GULCH is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPACIFICORP
Coordinates46.5704, -117.8287

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73112500 kVBONNEVILLE POWER ADMINISTRATION1.7 mi
#72570230 kVPACIFICORP2.2 mi
#72571230 kVPACIFICORP5.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PHALEN GULCH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PHALEN GULCH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LITTLE GOOSESubstation-AdjacentWAColumbia County500 kV1,000 MW1.7 yrs70.9
PHALEN GULCHSubstation-AdjacentWAGarfield County500 kV1,000 MW1.7 yrs69.1
LOWER SNAKE RIVER WIND ENERGY PROJECTSubstation-AdjacentWAGarfield County500 kV1,000 MW1.7 yrs68.8
Greenfield (LITTLE GOOSE - LOWER MONUMENTA)GreenfieldWAColumbia County500 kV1,000 MW1.7 yrs67.2
Greenfield (CENTRAL FERRY - LOWER MONUMENT)GreenfieldWAColumbia County500 kV1,000 MW1.7 yrs66.9
UNKNOWN206078Substation-AdjacentWAWhitman County115 kV100 MW1.7 yrs65.7
CENTRAL FERRYSubstation-AdjacentWAGarfield County500 kV1,000 MW1.7 yrs65.3
Greenfield (CENTRAL FERRY - LOWER GRANITE)GreenfieldWAGarfield County500 kV1,000 MW1.7 yrs64.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.