PATEROS

Substation

Washington · PUD NO 1 OF OKANOGAN COUNTY

Max voltage
115
kV

PATEROS is an electric transmission substation in Washington, operated by PUD NO 1 OF OKANOGAN COUNTY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorPUD NO 1 OF OKANOGAN COUNTY
Coordinates48.0489, -119.9246

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77937115 kVPUD NO 1 OF OKANOGAN COUNTY7.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PATEROS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PATEROS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHIEF JOSEPHSubstation-AdjacentWADouglas County500 kV1,000 MW1.7 yrs67.7
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWAChelan County500 kV1,000 MW1.7 yrs67.3
FOSTER CREEKSubstation-AdjacentWADouglas County230 kV300 MW1.7 yrs66.0
WELLSSubstation-AdjacentWADouglas County230 kV300 MW1.7 yrs65.6
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWADouglas County500 kV1,000 MW1.7 yrs65.3
UNKNOWN202925Substation-AdjacentWAChelan County115 kV100 MW1.7 yrs64.8
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWADouglas County500 kV1,000 MW1.7 yrs64.8
TAP206318Substation-AdjacentWADouglas County115 kV100 MW1.7 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PATEROS substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.