NELWAY

Substation

Washington · PUD NO 1 OF PEND OREILLE COUNTY

Max voltage
230
kV

NELWAY is an electric transmission substation in Washington, operated by PUD NO 1 OF PEND OREILLE COUNTY. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorPUD NO 1 OF PEND OREILLE COUNTY
Coordinates49.0063, -117.3411

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74394230 kVPUD NO 1 OF PEND OREILLE COUNTY2.9 mi
#74393115 kVPUD NO 1 OF PEND OREILLE COUNTY2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NELWAY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NELWAY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BOUNDARYSubstation-AdjacentWAPend Oreille County230 kV300 MW1.7 yrs63.9
NELWAYSubstation-AdjacentWAPend Oreille County230 kV300 MW1.7 yrs63.3
TAP203494Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs61.1
TAP203493Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs60.7
Greenfield (CUSICK - BOUNDARY)GreenfieldWAPend Oreille County230 kV300 MW1.7 yrs60.0
BOX CANYONSubstation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs59.6
TAP203495Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs59.4
Greenfield (CUSICK - BOUNDARY)GreenfieldWAPend Oreille County230 kV300 MW1.7 yrs59.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NELWAY substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.