MURRAY

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
230
kV

MURRAY is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPUD 1 OF SNOHOMISH COUNTY
Coordinates48.1543, -122.0835

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68037230 kVBONNEVILLE POWER ADMINISTRATION17.4 mi
#72423230 kVBONNEVILLE POWER ADMINISTRATION25.7 mi
#78597115 kVPUD 1 OF SNOHOMISH COUNTY3.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MURRAY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MURRAY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SNO-KINGSubstation-AdjacentWAKitsap County500 kV1,000 MW1.7 yrs77.1
MONROESubstation-AdjacentWASnohomish County500 kV1,000 MW1.7 yrs76.2
SNOHOMISHSubstation-AdjacentWASnohomish County345 kV600 MW1.7 yrs75.2
TAP200917Substation-AdjacentWASnohomish County500 kV1,000 MW1.7 yrs74.7
BOTHELLSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs73.9
TAP206030Substation-AdjacentWASnohomish County230 kV300 MW1.7 yrs72.7
MURRAYSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs72.1
Greenfield (TAP200917 - SNO-KING)GreenfieldWASnohomish County500 kV1,000 MW1.7 yrs71.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MURRAY substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.