MOSSYROCK PP

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
240
kV

MOSSYROCK PP is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage240 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerCITY OF TACOMA - (WA)
Co-ownerPUD NO 1 OF LEWIS COUNTY
Coordinates46.5329, -122.4312

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73123240 kVCITY OF TACOMA - (WA)0.3 mi
#73124240 kVCITY OF TACOMA - (WA)0.3 mi
#67453230 kVBONNEVILLE POWER ADMINISTRATION27.3 mi
#67454230 kVCITY OF TACOMA - (WA)11.8 mi
#72572115 kVPUD NO 1 OF LEWIS COUNTY14.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MOSSYROCK PP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MOSSYROCK PP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MOSSYROCKSubstation-AdjacentWALewis County240 kV300 MW1.7 yrs67.7
MAYFIELDSubstation-AdjacentWALewis County240 kV300 MW1.7 yrs66.7
TAP209044Substation-AdjacentWAThurston County115 kV100 MW1.7 yrs65.8
Greenfield (RAVER - PAUL)GreenfieldWAThurston County500 kV1,000 MW1.7 yrs64.6
RAINIER VIEWSubstation-AdjacentWAThurston County115 kV100 MW1.7 yrs63.9
TAP209043Substation-AdjacentWAThurston County115 kV100 MW1.7 yrs63.8
ELBESubstation-AdjacentWALewis County115 kV100 MW1.7 yrs63.7
HUNTTINGSubstation-AdjacentWALewis County115 kV100 MW1.7 yrs63.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MOSSYROCK PP substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.