MAIN CANAL HEADWORKS
SubstationWashington · AVISTA CORP
MAIN CANAL HEADWORKS is an electric transmission substation in Washington, operated by AVISTA CORP. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #73349 | 115 kV | AVISTA CORP | — | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of MAIN CANAL HEADWORKS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ROCKY FORD | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 71.6 |
| Greenfield (GRAND COULEE 500KV - HANFORD) | Greenfield | WA | Grant County | 500 kV | 1,000 MW | 1.7 yrs | 70.0 |
| GRAND COULEE 500KV | Substation-Adjacent | WA | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 69.6 |
| GRAND COULEE 230KV | Substation-Adjacent | WA | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 69.4 |
| LARSON | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 69.0 |
| GRAND COULEE | Substation-Adjacent | WA | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 68.8 |
| Greenfield (GRAND COULEE 500KV - HANFORD) | Greenfield | WA | Grant County | 500 kV | 1,000 MW | 1.7 yrs | 68.6 |
| EPHRATA | Substation-Adjacent | WA | Grant County | 115 kV | 100 MW | 1.7 yrs | 68.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for MAIN CANAL HEADWORKS substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.