LIND
SubstationWashington · AVISTA CORP
LIND is an electric transmission substation in Washington, operated by AVISTA CORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #74361 | 115 kV | BIG BEND ELECTRIC COOP, INC | — | 16.8 mi |
| #74367 | 115 kV | AVISTA CORP | — | 0.0 mi |
| #74368 | 115 kV | AVISTA CORP | — | 15.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of LIND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Greenfield (LOWER MONUMENTAL - HANFORD) | Greenfield | WA | Franklin County | 500 kV | 1,000 MW | 1.7 yrs | 66.1 |
| Greenfield (LOWER MONUMENTAL - HANFORD) | Greenfield | WA | Franklin County | 500 kV | 1,000 MW | 1.7 yrs | 64.8 |
| RITZVILLE | Substation-Adjacent | WA | Adams County | 115 kV | 100 MW | 1.7 yrs | 64.6 |
| TAP209230 | Substation-Adjacent | WA | Franklin County | 115 kV | 100 MW | 1.7 yrs | 63.6 |
| UNKNOWN202674 | Substation-Adjacent | WA | Lincoln County | 115 kV | 100 MW | 1.7 yrs | 63.6 |
| NELSON | Substation-Adjacent | WA | Adams County | 138 kV | 100 MW | 1.7 yrs | 63.1 |
| TAP203468 | Substation-Adjacent | WA | Franklin County | 115 kV | 100 MW | 1.7 yrs | 63.1 |
| SCHRAG | Substation-Adjacent | WA | Adams County | 115 kV | 100 MW | 1.7 yrs | 62.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.