INVALID

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
500
kV

INVALID is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as extra-high-voltage (500 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines2

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Coordinates47.6964, -121.8909

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67200500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE15.4 mi
#68035230 kVBONNEVILLE POWER ADMINISTRATION9.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of INVALID, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near INVALID substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SNO-KINGSubstation-AdjacentWAKitsap County500 kV1,000 MW1.7 yrs77.1
MONROESubstation-AdjacentWASnohomish County500 kV1,000 MW1.7 yrs76.2
MAPLE VALLEYSubstation-AdjacentWAKing County500 kV1,000 MW1.7 yrs76.0
SNOHOMISHSubstation-AdjacentWASnohomish County345 kV600 MW1.7 yrs75.2
TAP200917Substation-AdjacentWASnohomish County500 kV1,000 MW1.7 yrs74.7
BOTHELLSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs73.9
BERRYDALESubstation-AdjacentWAKing County230 kV300 MW1.7 yrs73.1
ECHO LAKESubstation-AdjacentWAKing County500 kV1,000 MW1.7 yrs72.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for INVALID substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.