FOSTER CREEK
SubstationWashington · BONNEVILLE POWER ADMINISTRATION
FOSTER CREEK is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #73438 | 230 kV | PUD NO 1 OF DOUGLAS COUNTY | — | 10.3 mi |
| #68084 | 115 kV | BONNEVILLE POWER ADMINISTRATION | — | 1.2 mi |
| #77940 | 115 kV | PUD NO 1 OF DOUGLAS COUNTY | — | 11.3 mi |
| #77941 | 115 kV | PUD NO 1 OF DOUGLAS COUNTY | — | 0.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of FOSTER CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CHIEF JOSEPH | Substation-Adjacent | WA | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 67.7 |
| UNKNOWN206474 | Substation-Adjacent | WA | Okanogan County | 275 kV | 300 MW | 1.7 yrs | 66.7 |
| FOSTER CREEK | Substation-Adjacent | WA | Douglas County | 230 kV | 300 MW | 1.7 yrs | 66.0 |
| WELLS | Substation-Adjacent | WA | Douglas County | 230 kV | 300 MW | 1.7 yrs | 65.6 |
| Greenfield (CHIEF JOSEPH - MONROE) | Greenfield | WA | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 65.3 |
| SAINT ANDREWS | Substation-Adjacent | WA | Douglas County | 230 kV | 300 MW | 1.7 yrs | 64.8 |
| Greenfield (CHIEF JOSEPH - SICKLER) | Greenfield | WA | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 64.2 |
| Greenfield (CHIEF JOSEPH - SICKLER) | Greenfield | WA | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 63.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for FOSTER CREEK substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.