EASTON

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

EASTON is an electric transmission substation in Washington, operated by PUGET SOUND ENERGY INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorPUGET SOUND ENERGY INC
Coordinates47.1836, -120.9572

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77729115 kVPUGET SOUND ENERGY INC11.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EASTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EASTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (SCHULTZ - RAVER)GreenfieldWAKittitas County500 kV1,000 MW1.7 yrs66.5
SAGEBRUSH POWER PARTNERSSubstation-AdjacentWAKittitas County230 kV300 MW1.7 yrs66.4
ELLENSBURGSubstation-AdjacentWAKittitas County115 kV100 MW1.7 yrs65.2
Greenfield (SCHULTZ - RAVER)GreenfieldWAKittitas County500 kV1,000 MW1.7 yrs64.6
Greenfield (SCHULTZ - RAVER)GreenfieldWAKittitas County500 kV1,000 MW1.7 yrs64.2
Greenfield (ROCKY REACH - MAPLE VALLEY)GreenfieldWAKittitas County345 kV600 MW1.7 yrs63.5
EASTONSubstation-AdjacentWAKittitas County115 kV100 MW1.7 yrs63.2
Greenfield (OLYMPIA - GRAND COULEE 230KV)GreenfieldWAKittitas County287 kV300 MW1.7 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EASTON substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.