DOE 451B

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

DOE 451B is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Coordinates46.4368, -119.3650

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68137115 kVBONNEVILLE POWER ADMINISTRATION3.0 mi
#68140115 kVBONNEVILLE POWER ADMINISTRATION6.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DOE 451B, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DOE 451B substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLUMBIA GENERATING STATIONSubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs73.5
HANFORDSubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs71.4
HIGHLANDSSubstation-AdjacentWABenton County115 kV100 MW1.7 yrs69.7
TAP209202Substation-AdjacentWABenton County115 kV100 MW1.7 yrs69.6
TAP209206Substation-AdjacentWABenton County115 kV100 MW1.7 yrs68.9
ANGUSSubstation-AdjacentWABenton County115 kV100 MW1.7 yrs68.8
UNKNOWN206039Substation-AdjacentWABenton County230 kV300 MW1.7 yrs68.8
GUM STREETSubstation-AdjacentWABenton County115 kV100 MW1.7 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DOE 451B substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.