DEADHEAD

Substation

Washington · BIG BEND ELECTRIC COOP, INC

Max voltage
115
kV

DEADHEAD is an electric transmission substation in Washington, operated by BIG BEND ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 11 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines11

Ownership & operation

OperatorBIG BEND ELECTRIC COOP, INC
Co-ownerCITY OF TACOMA - (WA)
Co-ownerPACIFICORP
Co-ownerPUD NO 1 OF CLALLAM COUNTY
Co-ownerPUD NO 1 OF OKANOGAN COUNTY
Co-ownerPUD NO 2 OF GRANT COUNTY
Co-ownerPUGET SOUND ENERGY INC
Coordinates47.4735, -121.5065

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77247115 kVPUGET SOUND ENERGY INCIN SERVICE0.5 mi
#77525115 kVPUGET SOUND ENERGY INCINACTIVE3.0 mi
#77564115 kVCITY OF TACOMA - (WA)INACTIVE0.4 mi
#77655115 kVPACIFICORP1.0 mi
#77795115 kVPUD NO 2 OF GRANT COUNTY0.1 mi
#77802115 kVPUD NO 2 OF GRANT COUNTY0.5 mi
#77862115 kVBIG BEND ELECTRIC COOP, INC3.1 mi
#77939115 kVPUD NO 1 OF OKANOGAN COUNTY0.4 mi
#77979115 kVPUD NO 1 OF CLALLAM COUNTY3.3 mi
#77980115 kVPUD NO 1 OF CLALLAM COUNTY2.7 mi
#78650115 kVPUGET SOUND ENERGY INC3.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEADHEAD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEADHEAD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ECHO LAKESubstation-AdjacentWAKing County500 kV1,000 MW1.7 yrs72.8
INVALIDSubstation-AdjacentWAKing County500 kV1,000 MW1.7 yrs72.7
TAP206230Substation-AdjacentWAKing County500 kV1,000 MW1.7 yrs72.4
TAP207895Substation-AdjacentWASnohomish County115 kV100 MW1.7 yrs67.1
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWASnohomish County500 kV1,000 MW1.7 yrs66.9
UNKNOWN202391Substation-AdjacentWAKing County230 kV300 MW1.7 yrs66.4
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWASnohomish County500 kV1,000 MW1.7 yrs66.1
TAP207939Substation-AdjacentWASnohomish County115 kV100 MW1.7 yrs66.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DEADHEAD substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.