CUSICK

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
230
kV

CUSICK is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPUD NO 1 OF PEND OREILLE COUNTY
Coordinates48.3340, -117.3447

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68222230 kVBONNEVILLE POWER ADMINISTRATION6.8 mi
#68223230 kVBONNEVILLE POWER ADMINISTRATION48.2 mi
#68224230 kVBONNEVILLE POWER ADMINISTRATION25.8 mi
#75539115 kVPUD NO 1 OF PEND OREILLE COUNTY4.4 mi
#75540115 kVPUD NO 1 OF PEND OREILLE COUNTY36.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CUSICK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CUSICK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CUSICKSubstation-AdjacentWAPend Oreille County230 kV300 MW1.7 yrs65.8
TAP204953Substation-AdjacentIDBonner County115 kV100 MW1.7 yrs64.4
PINE STREETSubstation-AdjacentIDBonner County115 kV100 MW1.7 yrs64.0
CLAYTONSubstation-AdjacentWASpokane County115 kV100 MW1.7 yrs62.4
USKSubstation-AdjacentWAPend Oreille County230 kV300 MW1.7 yrs62.1
Greenfield (BELL - ADDY)GreenfieldWASpokane County230 kV300 MW1.7 yrs62.1
Greenfield (BELL - USK)GreenfieldWASpokane County230 kV300 MW1.7 yrs61.6
TAP207702Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs61.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CUSICK substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.