CHIEF JOSEPH

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
500
kV

CHIEF JOSEPH is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as extra-high-voltage (500 kv) and connects 15 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage115 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines15

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPUD NO 1 OF DOUGLAS COUNTY
Coordinates47.9893, -119.6482

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73130500 kVBONNEVILLE POWER ADMINISTRATION1.1 mi
#73132500 kVBONNEVILLE POWER ADMINISTRATION1.3 mi
#73133500 kVBONNEVILLE POWER ADMINISTRATION1.4 mi
#73129500 kVBONNEVILLE POWER ADMINISTRATION0.9 mi
#73131500 kVBONNEVILLE POWER ADMINISTRATION0.9 mi
#67216500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE45.0 mi
#67217500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE31.9 mi
#67206500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE121.4 mi
#73128500 kVBONNEVILLE POWER ADMINISTRATION0.9 mi
#67253345 kVBONNEVILLE POWER ADMINISTRATION132.8 mi
#67254345 kVBONNEVILLE POWER ADMINISTRATION132.9 mi
#68089230 kVBONNEVILLE POWER ADMINISTRATION32.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CHIEF JOSEPH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CHIEF JOSEPH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHIEF JOSEPHSubstation-AdjacentWADouglas County500 kV1,000 MW1.7 yrs67.7
FOSTER CREEKSubstation-AdjacentWADouglas County230 kV300 MW1.7 yrs66.0
WELLSSubstation-AdjacentWADouglas County230 kV300 MW1.7 yrs65.6
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWADouglas County500 kV1,000 MW1.7 yrs65.3
SAINT ANDREWSSubstation-AdjacentWADouglas County230 kV300 MW1.7 yrs64.8
Greenfield (CHIEF JOSEPH - SICKLER)GreenfieldWADouglas County500 kV1,000 MW1.7 yrs64.2
COULEE CITYSubstation-AdjacentWADouglas County138 kV100 MW1.7 yrs63.7
Greenfield (CHIEF JOSEPH - SICKLER)GreenfieldWADouglas County500 kV1,000 MW1.7 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CHIEF JOSEPH substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.