BEACON

Substation

Washington · AVISTA CORP

Max voltage
230
kV

BEACON is an electric transmission substation in Washington, operated by AVISTA CORP. It is classified as high-voltage (230 kv) and connects 13 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines13

Ownership & operation

OperatorAVISTA CORP
Coordinates47.6808, -117.3442

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71387230 kVAVISTA CORP12.0 mi
#71350230 kVAVISTA CORP6.0 mi
#71349230 kVAVISTA CORP6.2 mi
#71394230 kVAVISTA CORP1.2 mi
#70501230 kVAVISTA CORP25.4 mi
#71386115 kVAVISTA CORP2.1 mi
#71388115 kVAVISTA CORP12.1 mi
#71389115 kVAVISTA CORP5.8 mi
#77382115 kVAVISTA CORP1.3 mi
#71351115 kVAVISTA CORP5.3 mi
#71353115 kVAVISTA CORP3.8 mi
#71354115 kVAVISTA CORP4.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BEACON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BEACON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WESTSIDESubstation-AdjacentWASpokane County230 kV300 MW1.7 yrs73.4
UPRIVER DAM HYDRO PLANTSubstation-AdjacentWASpokane County230 kV300 MW1.7 yrs71.8
TAP205408Substation-AdjacentIDKootenai County138 kV100 MW1.7 yrs71.2
LANCASTERSubstation-AdjacentWASpokane County230 kV300 MW1.7 yrs70.8
BELLSubstation-AdjacentWASpokane County500 kV1,000 MW1.7 yrs70.8
TAP206766Substation-AdjacentIDKootenai County138 kV100 MW1.7 yrs70.7
UNKNOWN201468Substation-AdjacentWASpokane County230 kV300 MW1.7 yrs70.3
OTIS ORCHARDSSubstation-AdjacentWASpokane County115 kV100 MW1.7 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.