BANGOR

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

BANGOR is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPUGET SOUND ENERGY INC
Coordinates47.7111, -122.6936

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68004115 kVBONNEVILLE POWER ADMINISTRATION14.0 mi
#75364115 kVPUGET SOUND ENERGY INC3.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BANGOR, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BANGOR substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MASSACHUSETTS STREETSubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs73.4
SEATTLE CITY EAST PINESubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs73.3
SOUTHSubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs72.1
DELRIDGESubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs71.3
DUWAMISHSubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs71.0
TAP206347Substation-AdjacentWAKitsap County230 kV300 MW1.7 yrs70.2
SOUTH BREMERTONSubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs69.7
MOUNTLAKESubstation-AdjacentWAKitsap County115 kV100 MW1.7 yrs69.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BANGOR substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.