BAKER RIVER SWITCHING STATION

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

BAKER RIVER SWITCHING STATION is an electric transmission substation in Washington, operated by PUGET SOUND ENERGY INC. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorPUGET SOUND ENERGY INC
Coordinates48.5421, -121.7423

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72455115 kVPUGET SOUND ENERGY INC22.7 mi
#72456115 kVPUGET SOUND ENERGY INC12.6 mi
#72458115 kVPUGET SOUND ENERGY INC0.2 mi
#72459115 kVPUGET SOUND ENERGY INC8.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BAKER RIVER SWITCHING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BAKER RIVER SWITCHING STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MURRAYSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs72.1
Greenfield (MONROE - CUSTER)GreenfieldWASnohomish County500 kV1,000 MW1.7 yrs69.7
EAST ARLINGTONSubstation-AdjacentWASnohomish County115 kV100 MW1.7 yrs66.3
NORTH MOUNTAINSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs66.0
Greenfield (HORSE RANCH - SEDRO WOOLLEY)GreenfieldWASnohomish County230 kV300 MW1.7 yrs65.3
Greenfield (HORSE RANCH - SEDRO WOOLLEY)GreenfieldWASnohomish County230 kV300 MW1.7 yrs65.1
Greenfield (MONROE - CUSTER)GreenfieldWASkagit County500 kV1,000 MW1.7 yrs65.1
KENDALLSubstation-AdjacentWAWhatcom County115 kV100 MW1.7 yrs64.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BAKER RIVER SWITCHING STATION substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.