ALDER

Substation

Washington · CITY OF TACOMA - (WA)

Max voltage
115
kV

ALDER is an electric transmission substation in Washington, operated by CITY OF TACOMA - (WA). It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorCITY OF TACOMA - (WA)
Coordinates46.8012, -122.3102

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72547115 kVCITY OF TACOMA - (WA)0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ALDER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ALDER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SOUTHWESTSubstation-AdjacentWAPierce County230 kV300 MW1.7 yrs72.4
TAP206441Substation-AdjacentWAPierce County230 kV300 MW1.7 yrs72.3
COWLITZSubstation-AdjacentWAPierce County230 kV300 MW1.7 yrs71.6
FREDERICKSON POWER LPSubstation-AdjacentWAPierce County230 kV300 MW1.7 yrs69.8
Greenfield (RAVER - PAUL)GreenfieldWAPierce County500 kV1,000 MW1.7 yrs69.8
YELM PPSubstation-AdjacentWAThurston County230 kV300 MW1.7 yrs69.5
BONNEY LAKESubstation-AdjacentWAPierce County115 kV100 MW1.7 yrs69.4
TAP206784Substation-AdjacentWAPierce County138 kV100 MW1.7 yrs69.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ALDER substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.