WEST CEDAR

Substation

Utah · DIXIE ESCALANTE R E A, INC

Max voltage
230
kV

WEST CEDAR is an electric transmission substation in Utah, operated by DIXIE ESCALANTE R E A, INC. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorDIXIE ESCALANTE R E A, INC
Co-ownerPACIFICORP
StateUtah
Coordinates37.6637, -113.1462

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72525230 kVPACIFICORP25.7 mi
#73794230 kVDIXIE ESCALANTE R E A, INC2.4 mi
#73787115 kVDIXIE ESCALANTE R E A, INC23.4 mi
#73790115 kVDIXIE ESCALANTE R E A, INC2.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WEST CEDAR, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WEST CEDAR substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WEST CEDARSubstation-AdjacentUTIron County230 kV300 MW1.7 yrs66.5
THREE PEAKSSubstation-AdjacentUTIron County345 kV600 MW1.7 yrs66.4
UNKNOWN202807Substation-AdjacentUTIron County230 kV300 MW1.7 yrs66.1
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTIron County500 kV1,000 MW5.7 yrs65.0
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTIron County500 kV1,000 MW5.7 yrs64.9
Greenfield (THREE PEAKS - RED BUTTE)GreenfieldUTIron County345 kV600 MW1.7 yrs64.2
COLEMANSubstation-AdjacentUTIron County138 kV100 MW1.7 yrs64.0
Greenfield (SIGURD - THREE PEAKS)GreenfieldUTIron County345 kV600 MW1.7 yrs63.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.