TAP209785
SubstationUtah · NORTHERN WASCO COUNTY PUD
TAP209785 is an electric transmission substation in Utah, operated by NORTHERN WASCO COUNTY PUD. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #72881 | 230 kV | PACIFICORP | — | 5.2 mi |
| #78353 | 230 kV | NORTHERN WASCO COUNTY PUD | — | 1.4 mi |
| #78972 | 115 kV | PACIFICORP | — | 1.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP209785, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN201878 | Substation-Adjacent | UT | Cache County | 230 kV | 300 MW | 1.7 yrs | 68.3 |
| UNKNOWN202633 | Substation-Adjacent | UT | Cache County | 230 kV | 300 MW | 1.7 yrs | 68.3 |
| TAP209784 | Substation-Adjacent | UT | Cache County | 230 kV | 300 MW | 1.7 yrs | 68.2 |
| UNKNOWN201320 | Substation-Adjacent | UT | Cache County | 230 kV | 300 MW | 1.7 yrs | 68.1 |
| UNKNOWN206400 | Substation-Adjacent | UT | Cache County | 230 kV | 300 MW | 1.7 yrs | 68.0 |
| UNKNOWN206399 | Substation-Adjacent | UT | Cache County | 230 kV | 300 MW | 1.7 yrs | 67.8 |
| UNKNOWN206563 | Substation-Adjacent | UT | Cache County | 230 kV | 300 MW | 1.7 yrs | 67.8 |
| UNKNOWN201913 | Substation-Adjacent | UT | Cache County | 230 kV | 300 MW | 1.7 yrs | 67.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP209785 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.