TAP209686

Substation

Utah · NORTHERN WASCO COUNTY PUD

Max voltage
115
kV

TAP209686 is an electric transmission substation in Utah, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerPACIFICORP
StateUtah
Coordinates40.5069, -112.3433

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74281115 kVPACIFICORP2.8 mi
#78378115 kVNORTHERN WASCO COUNTY PUD0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209686, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209686 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CAMP WILLIAMSSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs76.2
UNKNOWN206797Substation-AdjacentUTSalt Lake County275 kV300 MW1.7 yrs74.2
OQUIRRHSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs74.1
UNKNOWN201528Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs73.3
UNKNOWN206167Substation-AdjacentUTSalt Lake County275 kV300 MW1.7 yrs72.5
TERMINALSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs70.8
TAP205256Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs70.2
KEARNSSubstation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209686 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.