TAP209670

Substation

Utah · NORTHERN WASCO COUNTY PUD

Max voltage
115
kV

TAP209670 is an electric transmission substation in Utah, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerPROVO CITY CORP
StateUtah
Coordinates40.2156, -111.6408

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70843115 kVPROVO CITY CORP1.4 mi
#78373115 kVNORTHERN WASCO COUNTY PUD0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209670, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209670 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CAMP WILLIAMSSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs76.2
90TH SOUTHSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs75.0
STILL MILLSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs74.8
OQUIRRHSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs74.1
SPANISH FORKSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs71.8
SOUTH MOUNTAINSubstation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.8
UNKNOWN201657Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.8
WEST JORDANSubstation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.