TAP209625

Substation

Utah · NORTHERN WASCO COUNTY PUD

Max voltage
115
kV

TAP209625 is an electric transmission substation in Utah, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerSPANISH FORK CITY CORPORATION
StateUtah
Coordinates40.0934, -111.6070

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70863115 kVSPANISH FORK CITY CORPORATION3.3 mi
#78363115 kVNORTHERN WASCO COUNTY PUD1.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209625, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209625 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CAMP WILLIAMSSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs76.2
STILL MILLSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs74.8
SPANISH FORKSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs71.8
SOUTH MOUNTAINSubstation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.8
UNKNOWN201657Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.8
UNKNOWN201574Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.5
CLOVERSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs69.3
UNKNOWN202842Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209625 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.