TAP208887

Substation

Utah · PACIFICORP

Max voltage
138
kV

TAP208887 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates38.3864, -113.0166

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72689138 kVPACIFICORP12.7 mi
#72690138 kVPACIFICORP7.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208887, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208887 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MILDFORD WINDSubstation-AdjacentUTBeaver County345 kV600 MW1.7 yrs67.9
MILFORD WIND CORRIDOR STAGE II LLCSubstation-AdjacentUTBeaver County345 kV600 MW1.7 yrs67.0
TAP206480Substation-AdjacentUTBeaver County230 kV300 MW1.7 yrs66.4
MILFORD WIND CORRIDOR I LLCSubstation-AdjacentUTBeaver County345 kV600 MW1.7 yrs66.1
UNKNOWN206482Substation-AdjacentUTPiute County230 kV300 MW1.7 yrs65.7
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTBeaver County500 kV1,000 MW5.7 yrs63.7
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTBeaver County500 kV1,000 MW5.7 yrs63.7
BLUNDELLSubstation-AdjacentUTBeaver County138 kV100 MW1.7 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP208887 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.