TAP208867

Substation

Utah · PACIFICORP

Max voltage
138
kV

TAP208867 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates40.2194, -110.7275

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77334138 kVPACIFICORP19.5 mi
#77335138 kVPACIFICORP7.0 mi
#77337138 kVPACIFICORP9.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208867, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208867 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (EMERY - SPANISH FORK)GreenfieldUTCarbon County345 kV600 MW1.7 yrs63.2
Greenfield (HUNTINGTON - SPANISH FORK)GreenfieldUTCarbon County345 kV600 MW1.7 yrs62.0
Greenfield (BONANZA - MONA)GreenfieldUTDuchesne County345 kV600 MW1.7 yrs62.0
UNKNOWN202494Substation-AdjacentUTDuchesne County138 kV100 MW1.7 yrs61.7
UNKNOWN202521Substation-AdjacentUTDuchesne County138 kV100 MW1.7 yrs61.7
Greenfield (BONANZA - MONA)GreenfieldUTDuchesne County345 kV600 MW1.7 yrs60.7
UNKNOWN208868Substation-AdjacentUTWasatch County138 kV100 MW1.7 yrs60.4
TAP208867Substation-AdjacentUTDuchesne County138 kV100 MW1.7 yrs60.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP208867 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.