TAP207479

Substation

Utah · PACIFICORP

Max voltage
138
kV

TAP207479 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates38.9199, -111.9230

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75742138 kVPACIFICORP6.0 mi
#75743138 kVPACIFICORP0.0 mi
#75745138 kVPACIFICORP4.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207479, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207479 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP207480Substation-AdjacentUTSevier County138 kV100 MW1.7 yrs64.1
SIGURDSubstation-AdjacentUTSevier County345 kV600 MW1.7 yrs63.3
UNKNOWN202233Substation-AdjacentUTSevier County115 kV100 MW1.7 yrs63.2
RICHFIELDSubstation-AdjacentUTSevier County138 kV100 MW1.7 yrs63.0
UNKNOWN207474Substation-AdjacentUTSanpete County138 kV100 MW1.7 yrs62.8
UNKNOWN207475Substation-AdjacentUTSevier County138 kV100 MW1.7 yrs61.6
Greenfield (SIGURD - RED BUTTE)GreenfieldUTSevier County345 kV600 MW1.7 yrs61.6
Greenfield (CLOVER - SIGURD)GreenfieldUTSevier County345 kV600 MW1.7 yrs61.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen