TAP207467

Substation

Utah · PACIFICORP

Max voltage
115
kV

TAP207467 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates38.3165, -111.3853

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75729115 kVPACIFICORP4.2 mi
#75730115 kVPACIFICORP19.1 mi
#75733115 kVPACIFICORP0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207467, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207467 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN207468Substation-AdjacentUTWayne County115 kV100 MW1.7 yrs60.9
UNKNOWN207464Substation-AdjacentUTWayne County138 kV100 MW1.7 yrs60.3
UNKNOWN207463Substation-AdjacentUTSevier County138 kV100 MW1.7 yrs58.6
UNKNOWN207465Substation-AdjacentUTWayne County115 kV100 MW1.7 yrs57.7
UNKNOWN207470Substation-AdjacentUTWayne County115 kV100 MW1.7 yrs57.0
Greenfield (TAP207469 - UNKNOWN201833)GreenfieldUTWayne County115 kV100 MW1.7 yrs53.7
Greenfield (UNKNOWN207462 - UNKNOWN207463)GreenfieldUTSevier County138 kV100 MW1.7 yrs52.7
Greenfield (UNKNOWN207463 - UNKNOWN207464)GreenfieldUTWayne County138 kV100 MW1.7 yrs52.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.