TAP207420

Substation

Utah · PACIFICORP

Max voltage
115
kV

TAP207420 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates39.6946, -110.8576

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75666115 kVPACIFICORP8.3 mi
#75667115 kVPACIFICORP1.1 mi
#75668115 kVPACIFICORP0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207420, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207420 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HUNTINGTONSubstation-AdjacentUTSanpete County345 kV600 MW1.7 yrs68.3
CARBONSubstation-AdjacentUTCarbon County230 kV300 MW1.7 yrs67.2
TAP207473Substation-AdjacentUTCarbon County138 kV100 MW1.7 yrs65.8
UNKNOWN202486Substation-AdjacentUTCarbon County138 kV100 MW1.7 yrs65.8
Greenfield (HUNTINGTON - SPANISH FORK)GreenfieldUTCarbon County345 kV600 MW1.7 yrs64.8
TAP206750Substation-AdjacentUTCarbon County138 kV100 MW1.7 yrs64.7
Greenfield (HUNTINGTON - SPANISH FORK)GreenfieldUTCarbon County345 kV600 MW1.7 yrs64.0
TAP206754Substation-AdjacentUTCarbon County169 kV100 MW1.7 yrs63.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.