TAP207250

Substation

Utah · PACIFICORP

Max voltage
115
kV

TAP207250 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates41.7677, -110.6004

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74930115 kVPACIFICORP0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207250, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207250 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202402Substation-AdjacentWYLincoln County230 kV300 MW1.7 yrs71.6
UNKNOWN202400Substation-AdjacentWYLincoln County230 kV300 MW1.7 yrs70.6
CRAVEN CREEKSubstation-AdjacentWYLincoln County230 kV300 MW1.7 yrs70.1
NAUGHTONSubstation-AdjacentWYUinta County230 kV300 MW1.7 yrs67.8
Greenfield (POPULUS - JIM BRIDGER)GreenfieldWYLincoln County345 kV600 MW1.7 yrs64.6
Greenfield (POPULUS - JIM BRIDGER)GreenfieldWYLincoln County345 kV600 MW1.7 yrs64.5
Greenfield (POPULUS - JIM BRIDGER)GreenfieldWYLincoln County345 kV600 MW1.7 yrs64.2
Greenfield (CRAVEN CREEK - UNKNOWN201362)GreenfieldWYLincoln County230 kV300 MW1.7 yrs63.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207250 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.