TAP206820 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates41.0635, -111.0362

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74043115 kVPACIFICORP0.1 mi
#74545115 kVPACIFICORP0.3 mi
#74547115 kVPACIFICORP0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206820, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206820 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN204371Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs62.4
TAP204372Substation-AdjacentWYUinta County138 kV100 MW1.7 yrs62.1
UNKNOWN205659Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs61.5
UNKNOWN204365Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs61.3
UNKNOWN206816Substation-AdjacentUTSummit County138 kV100 MW1.7 yrs61.2
UNKNOWN206818Substation-AdjacentUTSummit County115 kV100 MW1.7 yrs60.6
RAILROADSubstation-AdjacentWYUinta County138 kV100 MW1.7 yrs60.4
UNKNOWN204369Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs60.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.