TAP206783 is an electric transmission substation in Utah, operated by DIXIE ESCALANTE R E A, INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorDIXIE ESCALANTE R E A, INC
StateUtah
Coordinates37.6696, -113.5304

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73787115 kVDIXIE ESCALANTE R E A, INC23.4 mi
#79167115 kVDIXIE ESCALANTE R E A, INC8.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206783, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206783 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RED BUTTESubstation-AdjacentUTWashington County345 kV600 MW1.7 yrs70.2
WEST CEDARSubstation-AdjacentUTIron County230 kV300 MW1.7 yrs66.5
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTWashington County500 kV1,000 MW5.7 yrs66.5
THREE PEAKSSubstation-AdjacentUTIron County345 kV600 MW1.7 yrs66.4
TAP208823Substation-AdjacentUTWashington County138 kV100 MW1.7 yrs66.1
UNKNOWN202807Substation-AdjacentUTIron County230 kV300 MW1.7 yrs66.1
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTIron County500 kV1,000 MW5.7 yrs65.0
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTIron County500 kV1,000 MW5.7 yrs64.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206783 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.