TAP206729

Substation

Utah · PACIFICORP

Max voltage
345
kV

TAP206729 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates40.4998, -111.4499

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73923345 kVPACIFICORP2.5 mi
#73924138 kVPACIFICORP3.3 mi
#73928138 kVPACIFICORP1.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206729, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206729 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
STILL MILLSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs74.8
UNKNOWN202842Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.1
BULTERVILLESubstation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.1
UNKNOWN201631Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.9
TAP205470Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.8
EVANS & SUTHERLANDSubstation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs68.8
UNKNOWN205955Substation-AdjacentUTWasatch County345 kV600 MW1.7 yrs68.7
UNKNOWN201916Substation-AdjacentUTUtah County115 kV100 MW1.7 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.