Max voltage
161
kV

TAP206701 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates41.0898, -112.0373

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72773161 kVPACIFICORP5.1 mi
#73883161 kVPACIFICORP0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206701, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206701 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN206797Substation-AdjacentUTSalt Lake County275 kV300 MW1.7 yrs74.2
TAP206407Substation-AdjacentUTSalt Lake County230 kV300 MW1.7 yrs73.6
UNKNOWN201528Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs73.3
UNKNOWN206387Substation-AdjacentUTSalt Lake County230 kV300 MW1.7 yrs72.9
UNKNOWN206367Substation-AdjacentUTDavis County230 kV300 MW1.7 yrs72.6
UNKNOWN206167Substation-AdjacentUTSalt Lake County275 kV300 MW1.7 yrs72.5
TAP206389Substation-AdjacentUTSalt Lake County230 kV300 MW1.7 yrs72.1
UNKNOWN201924Substation-AdjacentUTSalt Lake County230 kV300 MW1.7 yrs71.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.