TAP206642
SubstationUtah · DIXIE ESCALANTE R E A, INC
TAP206642 is an electric transmission substation in Utah, operated by DIXIE ESCALANTE R E A, INC. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #73792 | 138 kV | DIXIE ESCALANTE R E A, INC | — | 16.2 mi |
| #73775 | 115 kV | DIXIE ESCALANTE R E A, INC | — | 20.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP206642, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP206554 | Substation-Adjacent | UT | Washington County | 230 kV | 300 MW | 1.7 yrs | 72.7 |
| TAP206303 | Substation-Adjacent | UT | Washington County | 230 kV | 300 MW | 1.7 yrs | 72.4 |
| TAP206657 | Substation-Adjacent | UT | Washington County | 230 kV | 300 MW | 1.7 yrs | 72.4 |
| UNKNOWN206549 | Substation-Adjacent | UT | Washington County | 230 kV | 300 MW | 1.7 yrs | 70.4 |
| UNKNOWN206551 | Substation-Adjacent | UT | Washington County | 230 kV | 300 MW | 1.7 yrs | 69.6 |
| TAP206550 | Substation-Adjacent | UT | Washington County | 230 kV | 300 MW | 1.7 yrs | 69.5 |
| TAP206772 | Substation-Adjacent | UT | Washington County | 138 kV | 100 MW | 1.7 yrs | 68.8 |
| TAP206555 | Substation-Adjacent | UT | Washington County | 138 kV | 100 MW | 1.7 yrs | 68.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP206642 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.