TAP206464

Substation

Utah · CITY OF LOGAN - (UT)

Max voltage
230
kV

TAP206464 is an electric transmission substation in Utah, operated by CITY OF LOGAN - (UT). It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage132 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorCITY OF LOGAN - (UT)
StateUtah
Coordinates41.7507, -111.8493

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72859230 kVCITY OF LOGAN - (UT)1.1 mi
#72860138 kVCITY OF LOGAN - (UT)0.8 mi
#72862132 kVCITY OF LOGAN - (UT)0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206464, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206464 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN201878Substation-AdjacentUTCache County230 kV300 MW1.7 yrs68.3
UNKNOWN202633Substation-AdjacentUTCache County230 kV300 MW1.7 yrs68.3
TAP209784Substation-AdjacentUTCache County230 kV300 MW1.7 yrs68.2
UNKNOWN201320Substation-AdjacentUTCache County230 kV300 MW1.7 yrs68.1
UNKNOWN206400Substation-AdjacentUTCache County230 kV300 MW1.7 yrs68.0
UNKNOWN206399Substation-AdjacentUTCache County230 kV300 MW1.7 yrs67.8
UNKNOWN201913Substation-AdjacentUTCache County230 kV300 MW1.7 yrs67.8
UNKNOWN206563Substation-AdjacentUTCache County230 kV300 MW1.7 yrs67.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206464 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.