TAP205506

Substation

Utah · SPANISH FORK CITY CORPORATION

Max voltage
115
kV

TAP205506 is an electric transmission substation in Utah, operated by SPANISH FORK CITY CORPORATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorSPANISH FORK CITY CORPORATION
StateUtah
Coordinates40.1097, -111.6574

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70878115 kVSPANISH FORK CITY CORPORATION0.9 mi
#70879115 kVSPANISH FORK CITY CORPORATION3.0 mi
#70880115 kVSPANISH FORK CITY CORPORATION0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205506, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205506 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CAMP WILLIAMSSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs76.2
STILL MILLSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs74.8
OQUIRRHSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs74.1
SPANISH FORKSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs71.8
UNKNOWN201657Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.8
SOUTH MOUNTAINSubstation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.8
UNKNOWN201574Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs69.5
CLOVERSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs69.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205506 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.