TAP205424

Substation

Utah · PACIFICORP

Max voltage
138
kV

TAP205424 is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage115 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates40.3757, -111.7123

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70761138 kVPACIFICORP3.0 mi
#70782115 kVPACIFICORP2.2 mi
#70785115 kVPACIFICORP4.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205424, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205424 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CAMP WILLIAMSSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs76.2
90TH SOUTHSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs75.0
STILL MILLSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs74.8
OQUIRRHSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs74.1
SPANISH FORKSubstation-AdjacentUTUtah County345 kV600 MW1.7 yrs71.8
TERMINALSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs70.8
MIDVALLEYSubstation-AdjacentUTSalt Lake County345 kV600 MW1.7 yrs70.4
TAP205256Substation-AdjacentUTSalt Lake County138 kV100 MW1.7 yrs70.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.