TAP204332

Substation

Utah · BRIDGER VALLEY ELEC ASSN, INC

Max voltage
115
kV

TAP204332 is an electric transmission substation in Utah, operated by BRIDGER VALLEY ELEC ASSN, INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorBRIDGER VALLEY ELEC ASSN, INC
StateUtah
Coordinates41.3330, -110.3855

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69412115 kVBRIDGER VALLEY ELEC ASSN, INC30.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP204332, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP204332 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MONUMENTSubstation-AdjacentWYUinta County230 kV300 MW1.7 yrs65.1
UNKNOWN204608Substation-AdjacentWYUinta County138 kV100 MW1.7 yrs62.7
UNKNOWN204607Substation-AdjacentWYUinta County138 kV100 MW1.7 yrs61.4
UNKNOWN204365Substation-AdjacentWYUinta County115 kV100 MW1.7 yrs61.3
MOUNTAIN WIND POWER II LLCSubstation-AdjacentWYUinta County138 kV100 MW1.7 yrs60.9
Greenfield (MONUMENT - UNKNOWN201362)GreenfieldWYUinta County230 kV300 MW1.7 yrs60.8
WYOMING WIND ENERGY CENTERSubstation-AdjacentWYUinta County138 kV100 MW1.7 yrs60.7
Greenfield (MONUMENT - UNKNOWN201362)GreenfieldWYUinta County230 kV300 MW1.7 yrs60.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP204332 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.