TAP204332
SubstationUtah · BRIDGER VALLEY ELEC ASSN, INC
TAP204332 is an electric transmission substation in Utah, operated by BRIDGER VALLEY ELEC ASSN, INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #69412 | 115 kV | BRIDGER VALLEY ELEC ASSN, INC | — | 30.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP204332, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MONUMENT | Substation-Adjacent | WY | Uinta County | 230 kV | 300 MW | 1.7 yrs | 65.1 |
| UNKNOWN204608 | Substation-Adjacent | WY | Uinta County | 138 kV | 100 MW | 1.7 yrs | 62.7 |
| UNKNOWN204607 | Substation-Adjacent | WY | Uinta County | 138 kV | 100 MW | 1.7 yrs | 61.4 |
| UNKNOWN204365 | Substation-Adjacent | WY | Uinta County | 115 kV | 100 MW | 1.7 yrs | 61.3 |
| MOUNTAIN WIND POWER II LLC | Substation-Adjacent | WY | Uinta County | 138 kV | 100 MW | 1.7 yrs | 60.9 |
| Greenfield (MONUMENT - UNKNOWN201362) | Greenfield | WY | Uinta County | 230 kV | 300 MW | 1.7 yrs | 60.8 |
| WYOMING WIND ENERGY CENTER | Substation-Adjacent | WY | Uinta County | 138 kV | 100 MW | 1.7 yrs | 60.7 |
| Greenfield (MONUMENT - UNKNOWN201362) | Greenfield | WY | Uinta County | 230 kV | 300 MW | 1.7 yrs | 60.0 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP204332 substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.