SPANISH FORK
SubstationUtah · NORTHERN WASCO COUNTY PUD
SPANISH FORK is an electric transmission substation in Utah, operated by NORTHERN WASCO COUNTY PUD. It is classified as high-voltage (345 kv) and connects 15 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #67300 | 345 kV | PACIFICORP | — | 85.7 mi |
| #67294 | 345 kV | PACIFICORP | — | 20.7 mi |
| #67299 | 345 kV | PACIFICORP | — | 78.5 mi |
| #67293 | 345 kV | PACIFICORP | — | 35.1 mi |
| #71463 | 138 kV | PACIFICORP | — | 51.9 mi |
| #71464 | 138 kV | PACIFICORP | — | 53.8 mi |
| #70885 | 115 kV | PACIFICORP | — | 1.1 mi |
| #70886 | 115 kV | PACIFICORP | — | 32.0 mi |
| #71462 | 115 kV | PACIFICORP | — | 1.5 mi |
| #78363 | 115 kV | NORTHERN WASCO COUNTY PUD | — | 1.2 mi |
| #70791 | 115 kV | PACIFICORP | — | 23.6 mi |
| #70833 | 115 kV | PROVO CITY CORP | — | 17.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of SPANISH FORK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CAMP WILLIAMS | Substation-Adjacent | UT | Salt Lake County | 345 kV | 600 MW | 1.7 yrs | 76.2 |
| STILL MILL | Substation-Adjacent | UT | Utah County | 345 kV | 600 MW | 1.7 yrs | 74.8 |
| SPANISH FORK | Substation-Adjacent | UT | Utah County | 345 kV | 600 MW | 1.7 yrs | 71.8 |
| SOUTH MOUNTAIN | Substation-Adjacent | UT | Salt Lake County | 138 kV | 100 MW | 1.7 yrs | 69.8 |
| UNKNOWN201657 | Substation-Adjacent | UT | Salt Lake County | 138 kV | 100 MW | 1.7 yrs | 69.8 |
| UNKNOWN201574 | Substation-Adjacent | UT | Salt Lake County | 138 kV | 100 MW | 1.7 yrs | 69.5 |
| UNKNOWN202842 | Substation-Adjacent | UT | Salt Lake County | 138 kV | 100 MW | 1.7 yrs | 69.1 |
| UNKNOWN201631 | Substation-Adjacent | UT | Utah County | 115 kV | 100 MW | 1.7 yrs | 68.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.