RED BUTTE

Substation

Utah · PACIFICORP

Max voltage
345
kV

RED BUTTE is an electric transmission substation in Utah, operated by PACIFICORP. It is classified as high-voltage (345 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage115 kV
Voltage classHigh-voltage (345 kV)
Connected lines6

Ownership & operation

OperatorPACIFICORP
StateUtah
Coordinates37.4130, -113.6452

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79136345 kVPACIFICORP45.9 mi
#79155345 kVPACIFICORPUNDER CONSTRUCTION169.6 mi
#79162138 kVPACIFICORP20.1 mi
#79163138 kVPACIFICORP20.1 mi
#79165138 kVPACIFICORP20.2 mi
#79156115 kVPACIFICORP15.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RED BUTTE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RED BUTTE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP206554Substation-AdjacentUTWashington County230 kV300 MW1.7 yrs72.7
TAP206608Substation-AdjacentUTWashington County230 kV300 MW1.7 yrs72.4
TAP206303Substation-AdjacentUTWashington County230 kV300 MW1.7 yrs72.4
TAP206657Substation-AdjacentUTWashington County230 kV300 MW1.7 yrs72.4
TAP206309Substation-AdjacentUTWashington County230 kV300 MW1.7 yrs70.8
UNKNOWN206549Substation-AdjacentUTWashington County230 kV300 MW1.7 yrs70.4
UNKNOWN201442Substation-AdjacentUTWashington County230 kV300 MW1.7 yrs70.3
RED BUTTESubstation-AdjacentUTWashington County345 kV600 MW1.7 yrs70.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RED BUTTE substation, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.